Demolition of E. B. Fred Hall
x
 at the University of Wisconsin-Madison 

in the Summer and Fall of 2004

x

 PAGE 12 

  Go to Page  
12345,
678910,
11, 13, 14, 15.

x

x
1
x
2
x
3

Sunday, October 17

1 and 2: Views of the newer section from Linden Drive and the older section from the parking lot.

x

Monday, October 18

3 through 5: Removing more of the top story of the newer section from the rear of the building – zipping the post-tension cables out from the concrete with the greatest of ease.

6: Sorting the metal and the concrete over at the older section.

x

Tuesday, October 19

7 through 9: Removing more of the top story from the newer section on an increasingly foggy night.

x

Wednesday & Thursday, October 20 & 21

10 through 12: Removal of the top story continues with the careful job of removing the chunks of concrete – accomplished in large part by the Bobcat as shown in Photos 10 and 11. A bit of macgyvering is seen in Photo 12 where a piece of scrap steel is used with a bulldozer to scrape off the debris.

13: Getting an old lab desk ready to be used again by one of the former residents.

14: The steeple of the historic Congregational Church is seen in the background with this steeple wannabe.

15: The Bobcat is gently taken down by the bulldozer.

x
4
x
5
x
6
x
7
x
8
x
9
x
10
x
11
x
12
x
13
x
14
x
15

« Previous   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   Next »


Page content was last modified on 12/12/04 at 4:00 PM, CST.
These pages are best viewed at 800X600 screen resolution.
John Lindquist:  new homepage, complete site outline.
Department of Bacteriology, U.W.-Madison